Tasks with a due date of today should show in current daily-jot or other default note

10 votes

My original thought was a reoccurring task should be able to be flagged so it always shows in the current daily-jot or selectable default note without the need to go to 'Tasks' to surface the item or to the original note to !move the item.

But in thinking about more than my use case, someone should be able to create a task in one note and then flag it to be visible in another note on it's due date. This would handle reoccurring tasks, as well as any other task that someone might want to show across notes.

From a workflow perspective changing notes constantly or having to !move reoccurring tasks between notes constantly is very frustrating and unneeded overhead.

Tasks created in a daily-jot that are reoccurring these should !move to current daily jot if flagged everyday. Tasks created outside of daily-jot perhaps a new !link command or !show command would work to surface it in the most current daily-jot or user defined default note.

Done tasks Suggested by: TylerC Upvoted: 03 Feb Comments: 4

Comments: 4